Your Position:Home > Faq

The operation and installation of jaw crusher

This machine is supported as a whole after manufacturing and assembling. The users shall take a check after the receiving to eliminate the possible problem in the transport process. It is allowed to start only in non-load condition.

1. It is suggested that the machine should be installed on the concrete foundation as its large vibrating quantity when working. Reducing and absorbing the vibration and noise can avoid the vibration caused by machine working affecting the building foundation. Laying hardwood liner, rubber belt or other slow-vibrating material in the middle of the crusher and concrete foundation would be the best.


2. The foundation weight is about 5-10 times as heavy as the machine. The foundation depth should be greater than the frozen land depth. About the machine’s installation and anchor bolt’s position, refer to the foundation drawing.

3. Before adjusting the discharge port, loosen the tension spring first. After it, appropriately adjust the tension extent of the spring to prevent the lining plate from falling in the working.